Products
Tumbling Barrel Drop Test Machine For Luminaires Testing IEC 60598-1
Products Description
Tumbling Barrel Drop Test Machine For Luminaires Testing IEC 60598-1
Product Information For Tumbling Barrel Drop Test Machine:
Standard: Conforms to IEC 60598-1 clause 4.13.6, figure 25.
Application: This device is suitable for checking whether plug-ballast/transformers and mains socket-outlet-mounted luminaires have adequate mechanical strength.
Test sample: Plug-ballast/transformers and mains socket-outlet-mounted luminaires.
Feature: This tester can preset test times, automatic stop when set test times completed.
Technical Parameters For Tumbling Barrel Drop Test Machine:
Test Procedures and Operation Steps For Tumbling Barrel Drop Test Machine:
Plug-ballast/transformers and mains socket-outlet-mounted luminaires shall have adequate mechanical strength.
Rotate speed
5rpm
Drop rate
10 time per min
Material
3mm high quality steel plate
Test times
0~9999 can be preset
Drop height
500 mm
Barrel width
1000 mm (in order to be compatible with user’s big specimens)
Barrel number
Single
Application
Plug-ballast/transformers and mains socket-outlet-mounted luminaires
Standards
IEC 60598-1 clause 4.13.6, figure 25
Power supply
220V,50Hz
Compliance is checked by the following test, which is made in a tumbling barrel as shown in Figure 25.
The barrel is turned at a rate of five revolutions per minute, ten falls per minute thus taking place.
The sample falls from a height of 50 cm onto a steel plate 3 mm thick, the number of falls being:
– 50 if the mass of the sample does not exceed 250 g;
– 25 if the mass of the sample exceeds 250 g.
After the test, the sample shall show no damage within the sense of this standard, but it need not be operative and any damage to the glass bulb shall be ignored. Provided that the protection against electric shock is not affected, small pieces which may have broken off the
sample are ignored.
Distortion of pins and damage to the finish and small dents which do not reduce the creepage distances or clearances below the values specified in Section 11 are ignored.