Products
IEC 61851-1 High Low Temperature Climate Charging Pile Test Chamber
Products Description
IEC 61851-1 High & Low Temperature Climate Charging Pile Test Chamber
System Overview:
This walk-in test chamber simulates the temperature and humidity changeable environment for the products or materials. It is widely used in the adaptability test of electrical, electronics, instrument and meter and other product parts under high and low temperature and humid environment during storage, transportation and usage, to determine the temperature adaptability of the above products or materials to high and low temperature and humid environment, especially for product electrification changes in performance and mechanical properties.
It conforms to standards:
IEC 61851-1 clause 12.9 and 12.10
IEC60068-2-1:2007 “Environmental Testing-Part 2-1: Tests-Test A: Cold, IDT”
IEC60068-2-2:2007 “Environmental Testing-Part 2-1: Tests- Test B-Dry heat, IDT”
IEC60068-2-78:2012 “Environmental Testing-Part 2-78: Tests-Test Cab: Damp heat, steady state, IDT”
IEC60068-2-30:2005 “Environmental Testing-Part 2-30: Tests-Test Db: Damp heat, cyclic (12h+12h cycle), IDT”
This chamber is required by many standard requirements, such as IEC 61851-23 clause 101.2.1.1, etc.
Features:
1. The test system has advanced and reasonable structural design, standardized manufacturing process, beautiful appearance and generous appearance.
A) Test and storage of samples of flammable, explosive and volatile substances
B) Test of corrosive substance samples,test and storage of biological samples
C) Test and storage of strong electromagnetic emission source samples
About W3700 mm*H3200 mm*D4000 mm(Excluding unit size)
Reminder: Please refer to the final design and confirm the three views for the external dimensions
IEC60068-2-1:2007 “Environmental Testing-Part 2-1: Tests-Test A: Cold, IDT”
IEC60068-2-2:2007 “Environmental Testing-Part 2-1: Tests- Test B-Dry heat, IDT”
IEC60068-2-78:2012 “Environmental Testing-Part 2-78: Tests-Test Cab: Damp heat, steady state, IDT”
IEC60068-2-30:2005 “Environmental Testing-Part 2-30: Tests-Test Db: Damp heat, cyclic (12h+12h cycle), IDT”
PS: Standard humidity 20%~95%HR
Quantity: 2
Location: On the door of the test room (or the place designated by the customer)
Form: 3-layer vacuum strengthened glass with built-in anti-fogging heating element
The floor is designed with a drainage tank,and the test chamber has no water inside after the end of high temperature and humidity test Conventional constant humidity method: When the actual temperature reaches the set temperature, the compressor's cooling capacity remains unchanged, and the heating method is used to offset the compressor's cooling capacity to achieve temperature balance in the box.
Cold balance method: When the actual temperature reaches the set value, the cold solenoid valve output is controlled by the controller PID, and the temperature in the box is balanced through the controlled cooling output. Compared with the conventional constant humidity method, the heating output is reduced to make the whole unit Compared with the conventional method, the equipment can achieve 40% energy saving
With temperature and humidity measurement sensor and controller
PT100 platinum resistance sensor
Original imported German Bitzer semi-hermetic compressor.
2 sets of 6HP compressors
Non-fluorine environmental protection HFC404A (Honeywell) and DuPont R23 refrigerant
High-efficiency shell and tube type (water cooling)
Equipped with cooling water tower (well-known brand) and pipeline
High-efficiency multi-section fin evaporator with hydrophilic membrane (thickened fin)
Emerson AW
Japan Saginomiya and Danfoss
All high-quality products of the first international brand (pictured on the right: drying filter)
Freezing and dehumidifying by the refrigeration system (the air in the box passes through the evaporator below the dew point temperature, and water is precipitated).
*Choose evaporator fins with hydrophilic membrane treatment, better dehumidification performance, because the water tension of the hydrophilic membrane aluminum fins is small, the water droplets from air condensation are easy to slip off, and it is not easy to produce obstructive water bridges in the fin gap. Thereby greatly improving the dehumidification efficiency!
A) The humidification cylinder (boiler method) is used for humidification, which is faster than the traditional surface humidification (water pan type) and has higher control accuracy.
In the box
It will not produce impurity pollution such as scale, has good low-humidity performance, and is easy to clean.
B) The humidification tube adopts all stainless-steel seamless casing, the insulation resistance is greater than 50MΩ, and has a dry-burn prevention controller
C) The humidification cylinder is made of stainless steel and has a water level observation window.
D) Low temperature with dry air
Non-contact control the output signal of the controller achieves high precision through SSR solid state relay
Non-contact switch control
The main components of the control circuit are all high-quality brands
1. Test product over-temperature protection (independent)
2. With no fuse protection switch
3. Heater over-temperature protection switch
4. The compressor is overloaded and overheated
5. Compressor high- and low- pressure protection
6. System over-current protection device
7. The controller self-diagnoses the fault and displays it
8. Cooling water pressure is too low protection
9. Leakage protection, short circuit protection, wrong phase / phase loss protection, fan overload protection, independent over temperature protection, water shortage protection, water cut protection, operation indication, sound and light alarm, automatic power off after alarm, etc.
1. Ambient temperature: -5℃~+28℃;
2. Relative humidity: ≤85%RH;
3. Atmospheric pressure: 80kPa~106kPa
4. No strong vibration around
5. Equipment power supply: (note that the test power supply is not included)
5.1 Connect to power supply 380V AC (±10%), three-phase wire + protective ground wire, grounding resistance ≤ 4Ω;
5.2 Total power: about 25KW
5.3 Maximum working current: about 60A
2. The main functional components of the test chamber are world famous branded ones. The test chamber has best control of noise and energy saving.
3. The matching of components and assembly is good. The main functional components are imported from the internationally branded companies, which improves the safety and reliability of the test chamber, and can ensure the long-term, high-frequency usage purposes.
4. The equipment has good operability, maintainability, good temperature stability and durability, good safety performance. It does not pollute the environment and endanger human health.
1.Product name
Walk-in Constant Temperature and Humidity Test Chamber
Mode
SN881-18m3
2.Applicable instructions
2.1. Applicable range
This equipment is suitable for environmental simulation reliability tests of various electrical and electronic products and other products, parts and materials, such as constant high and low temperature, gradual change, and cycle tests.
2.2. Safety test restrictions
3.Volume and size
3.1. Effective volume
18m³
3.2. Inner box size
WDH=3×2×3m
3.3. Outer box size
4.Performance
4.1. Cooling method
Water cooling
4.2. Temperature range
-40°~ 120℃
4.3. Humidity range
30%-98%RH
4.4. Temperature /humidity fluctuation
±2℃ / ±2.0%RH
4.5. Temperature resolution accuracy
0.01℃
4.6. Humidity resolution accuracy
0.01RH
4.7. Temperature uniformity
≤2℃
4.8. Humidity uniformity
< 75%RH:±3%RH; >75%RH±5%RH
4.9. Heating time
RT~120℃≤90min
4.10. Cooling time
RT~-40℃≤130min
4.11. Temperature rise and fall overshoot
≤±1℃
4.12. Load situation
4KW(Generating capacity of heat of sample)
4.14. Test standards
4.15. Schematic diagram of temperature and humidity
5.Structure and material
5.1 Outer box material
Adopt advanced cold and hot steel plate non-static nano-baking paint
5.2. Inner box material
SUS304 stainless steel plate
5.3. Thermal insulation materials
High temperature and fire-resistant rigid polyurethane foam
5.4. Door frame sealing strip
Silicone rubber sealing strip
5.5. Chamber door
Double-leaf doors open outside, the door frame and the edge of the door panel are equipped with electric heating devices and overflow ditch
5.6. Electric heating glass observation window
5.7. Lighting
High and low temperature resistant explosion-proof energy-saving lamp
5.8. Pressure balance port
All aluminum alloy with anti-sweat line 4 sets of self-resetting pressure windows
5.9. Weight bearing
Laboratory load: 1000KG
5.10. Sample hole
A hole with a diameter of φ100mm on the left side chamber wall and equipped with a rubber isolation plug and a rubber cover at the same time.
5.11. Non-slip floor
The floor adopts a 4.0mm stainless steel non-slip design to prevent personnel from being injured during internal operations.
5.12 Drainage
5.13 Foot cup
The foot cup of the electric box adopts silica gel pad to absorb shock and protect the compressor and copper pipe welding
5.15. Noise of the whole machine
≦80dB
6.Air conditioning system
6.1. Constant temperature method
Adopt cold balance method
6.2. Working principle of energy saving
6.3. Air cooling method
Cascade compressor refrigeration
6.4. Circulating motor
Taiwan Tatung Low Voltage Induction Motor
6.5. Sensor
6.6. Wind wheel
Multi-wing centrifugal circulating fan, high and low temperature resistant aluminum alloy blade
7.Refrigerating system
7.1. Cooling method
Original imported cascade silent type, high efficiency and energy saving compressor
7.2. Compressor
7.3. Refrigerant
7.4. Condenser
7.5. Evaporator
7.6. Oil separator
7.7. Expansion valve
Danfoss Thermal Expansion Valve
7.8. Solenoid valve
7.9. Other accessories
7.10. Dehumidification
8. Heating and humidification system
8.1. Heating method
Electric heating
8.2. Steam supply method
Open direct injection, the inside of the generator is directly connected to the test chamber, keeping the internal pressure close to zero
8.3. Heating tube
Stainless steel finned nickel-chromium alloy electric heating tube, heating tube anti-MC adhesion design, heater connection, heat-resistant wire is used, the heater is placed in the circulating air duct on the top of the box, and fire-resistant and heat-insulating materials are added around it
8.4. Humidification tube
8.5. Control method
8.6. Humidification boiler
Installed inside the machine room
8.7. Humidification water treatment
Equipped with a dedicated water softening device, which can effectively remove impurities in the water (1 set of pure water recovery system device, with activated carbon filter to filter water impurities).
9.Control system
9.1. Controller
The controller has English display, self-diagnosis function, prompts the cause of failure and treatment method, and records test data and process
9.2. Dialogue interface
Industrial control architecture touch screen LCD color display, English menu dialogue mode
9.3. Setting accuracy
Temperature 0.1℃, time 0.1 minutes, humidity 1%RH
9.4. Temperature input
High-precision sensor
9.5. Humidity input
High-precision electrostatic capacitance humidity sensor
9.6. Control method
PID control
9.7. Operation mode
Program operation mode, fixed value operation mode, timing start-up operation mode
9.8. System capacity
1000 groups of programs*100 segments per group (1000 times can be cycled separately), the number of segments required by each group of programs can be divided arbitrarily, and each group of programs can be freely linked to each other
9.9. Test data display
Set temperature, measured temperature, total operating time, segment operating time, segment remaining time, heating status, calendar time, etc.
9.10. Built-in PLC function
It can directly drive each execution part, and the logic operation is completed by PLC software
9.11. Automatic selection of refrigerator working conditions
According to different test conditions, automatically select the working state of the refrigerator
9.12. Communication interface
Equipped with RS485 interface, it can be connected to an external computer for remote temperature control, and it has a computer remote diagnosis function. It can adjust and monitor the operation of the equipment, programs, instructions, and software through the Inter network.
10. The main components of the control circuit
11. Safety protection function
12. Conditions of use